Take Twice Daily to Relieve Congestion.

News

I-5 Corridor Improvements - SR 134 to Buena Vista Street

April 7, 2016

Work will occur during daytime hours unless otherwise noted.

SR 134 to Magnolia Boulevard

Soundwall: Construction of the soundwall on southbound I-5 over the Los Angeles River.

Bridge Work: Pier construction near the Los Angeles River Bike Path.

Magnolia Boulevard to Buena Vista Street

Buena Vista Street Bridge (Winona Bridge): Form deck for southbound I-5 widening.

Buena Vista Street Railroad Bridge: Form and pour median pier caps.

Empire Avenue Railroad Underpass: Retaining wall footings and CIDH (cast in drilled hole) piles along Empire Avenue in front of the abutments. 

Railroad Retaining Wall: Installation of the covering on the top of the wall (coping) between Hollywood Way and Burbank Boulevard.

Utility Work: Resurfacing asphalt pavement for Burbank Water and Power trench on Victory Place between Wilson Avenue and Empire Avenue.  


SR-134 to Magnolia Boulevard

+ The Los Angeles River Bike Path between Riverside Drive and just south of the SR-134 overcrossing in the City of Los Angeles will be closed through spring 2016. A signed detour is posted that directs bike path users to Zoo Drive and Western Heritage Way. See map here.

Magnolia Boulevard to Buena Vista Street

+ Daytime closures on Victory Place between Wilson Avenue and Empire Avenue. One lane in each direction will remain open at all times. Flaggers will direct motorists. 

+ Buena Vista Street closures between Winona Avenue and San Fernando Boulevard:

  • Day closures: Intermittent lane closures in both directions from 9 a.m. to 3 p.m. The street will remain open to motorists.  
  • Night closures: Intermittent full street closures in both directions from 10 p.m. to 6 a.m. Detours will be posted.

← Return to News