I-5 Corridor Improvements Between Orange County Line to the I-605
May 20, 2016
FLORENCE AVENUE INTERCHANGE PROJECT The most recent pile driving activity adjacent to the Florence Avenue interchange along northbound I-5, just south of the Florence Avenue bridge, has been temporarily completed. Crews also completed the most recent operation driving test piles along the southbound I-5 Florence Avenue on-ramp. Crews are working to form soundwalls along northbound and southbound I-5. Roadway excavation is underway behind k-rail and the construction fencing, along Mondon Avenue between Cecilia Street and Buell Street. Over the next few weeks crews will be pouring concrete for the new soundwall adjacent to southbound I-5. This work will be conducted weekdays (Monday through Friday) between 6:30 a.m. and 3 p.m. and will be ongoing for approximately the next two to three weeks. Finally, work is ongoing on the Orr and Day railroad bridge, which runs perpendicular to I-5, underneath the freeway, south of Florence Avenue.
Crews have begun work on the detention basin on Adoree Street / Zeus Street; this work will include grading, excavation and removal of the sidewalk on Zeus Street. This work will be conducted during the daytime, Monday through Fridays, and is expected to be ongoing for approximately one month. Adoree Street and Frontage Road, have both been opened to through traffic between Imperial Highway and Norwalk Boulevard.
deck. The closure area is shown on the map below in red, the detour route is highlighed in blue. e ROSECRANS AVENUE & BLOOMFIELD AVENUE BRIDGE PROJECT Crews will close outside lanes along northbound and southbound I-5 from Rosecrans Avenue to Carmenita Road, nightly between 10 p.m. and 5 a.m., Monday, May 23 through Thursday, May 26. No detour route will be needed, as one lane will remain open at all times. These lane closures are needed as crews complete paving work along the freeway mainline. Crews will close outside lanes along northbound and southbound I-5 from Rosecrans Avenue to Alondra Boulevard, nightly between 10 p.m. and 5 a.m., Monday, May 23 through Thursday, May 26. In addition, crews will close the southbound I-5 Carmenita Road off-ramp and the southbound I-5 Rosecrans Avenue on-ramp, nightly between 7 p.m. and 5 a.m., Monday, May 23 through Friday, May 27. Motorists will be directed to use the freeway ramps at Valley View Avenue while these ramps are closed. These ramp closures will allow crews to conduct paving operations. For detailed information regarding this closures including alternate routes, please visit the project Google map.
As a result of the traffic shift onto the new Carmenita Road bridge, the traffic pattern at the intersection of Firestone Boulevard and Carmenita Road has been temporarily detoured; motorists exiting southbound I-5 at Carmenita Road will only be permitted to continue straight on Firestone Boulevard.
|