Take Twice Daily to Relieve Congestion.

News

Overnight Closure on Firestone Blvd. & Daytime Lane Closure on Imperial Hwy

February 12, 2019

Tonight, Tue. 2/12:
(La Mirada) Firestone Blvd. is scheduled to be closed from Gateway Dr. to Valley View Ave. from 8 p.m. to 6 a.m. for driveway construction. There may also be traffic control with flagging on valley View from Alondra Blvd. to the railroad tracks north of Arbor Pl. Business access permitted.

Wed. 2/13:
(Norwalk) The contractor will be paving the median on Imperial Highway in the construction zone east of I-5 from 8:30 a.m. to 5 p.m. Expect some lane blockage with traffic control & flagging.

Thank you for your cooperation.

← Return to News